Guttroff’s green hydrogen production will include a 5 MW electrolyzer from partner ITM Power, a compressor line, a hydrogen storage facility, four trailer refueling stations, and a public hydrogen filling station for trucks, cars, and buses when production starts in May 2026.
Bavarian Minister of Economic Affairs Hubert Aiwanger commented on Guttroff’s green hydrogen production: “The hydrogen project in Dettelbach covers the entire value chain. The hydrogen produced can be made available directly to the mobility sector via the on-site filling station and sold through Guttroff GmbH’s existing sales network. Even the waste heat from the electrolyzer will be utilized.”
Photo of Guttroff Unternehmensgruppe
Press release (translated by Google) https://tinyurl.com/3sptrs9e
