HVR Energy, a company which develops and operates hydrogen distribution infrastructure for mobility, accelerating the decarbonisation of transport by deploying hydrogen supply solutions, is taking a key step towards bringing renewable hydrogen to the existing network of stations. In the first phase, company is prioritising Badajoz and Córdoba, with the aim of starting operations before March 2026. HVR Energy will be responsible for the installation, commissioning, maintenance and supply of H₂, while Q8 will manage sales to end customers.
The rollout will be coordinated with INICIA, a compact 350 bar solution with low power consumption and a small footprint, designed to be easily integrated into existing stations. The logistics —with compressed H₂ reception— reduce local compression requirements, shorten lead times and optimise costs.
Press release (Translated with DeepL. com ) https://tinyurl.com/an6rz78k
Photo of HVR Energy
